Here it is, started January 2024, the hexie quilt flimsy is done
13 rows of flowers, every other row has 12 flowers, the alternate rows have 11 flowers plus 2 half flowers, the mathematicians among might want to add that lot up 😉
In between are neutrals, 3 different light fabrics.
All hand sewn!
So that's it for now, it needs batting and backing then I'll hand quilt around the flowers.
Lot's to do still, a job for when I'm in my new craft space.
Henry has been enjoying the pool, February has had very hot days, in the high 20s, even the low 30s
The plumbers are done pre plumbing, they'll be back later in the process
Vent in for the cooker hood and copper pipe for the gas supply to oven
Pipe work for the vanity taps and waste in the main bathroom
Pipe work for the shower mixer tap
Poor photo, shower supply
Looking through the floor at the drainage pipes
WC channel dug for waste and pipe work for taps and waste for toilet done
Michael, Tash and the kiddies went off for a long weekend camping trip, I wonder how that's going?
Joe's been up the top house today, pulling my craft room apart, ceiling down, most of the walls off, a dirty, dusty, rat poo filled job
That's it for today, catch ya later
Sue x
No comments:
Post a Comment