Thursday, 6 February 2025

A this and that kinda post

 Here it is, started January 2024, the hexie quilt flimsy is done

13 rows of flowers, every other row has 12 flowers, the alternate rows have 11 flowers plus 2 half flowers, the mathematicians among might want to add that lot up 😉 

In between are neutrals, 3 different light fabrics.

All hand sewn!

So that's it for now, it needs batting and backing then I'll hand quilt around the flowers. 

Lot's to do still, a job for when I'm in my new craft space.


Henry has been enjoying the pool, February has had very hot days, in the high 20s, even the low 30s




The plumbers are done pre plumbing, they'll be back later in the process
Vent in for the cooker hood and copper pipe for the gas supply to oven

Pipe work for the vanity taps and waste in the main bathroom 

Pipe work for the shower mixer tap

Poor photo,  shower supply

Looking through the floor at the drainage pipes

WC channel dug for waste and pipe work for taps and waste for toilet done 


Michael, Tash and the kiddies went off for a long weekend camping trip, I wonder how that's going?



Joe's been up the top house today, pulling my craft room apart,  ceiling down, most of the walls off, a dirty, dusty, rat poo filled job




That's it for today, catch ya later


Sue x


No comments:

Post a Comment

Back to work after the long weekend

  The GIB stoppers were back today, touching up, sanding and putting up the coving, they need to come back to sand what they did today, then...