...they sure did today. Some of Michael's workmates came to help put up GIB board.
They've done a great job, still some to do, but they achieved so much.
The guy installing the heat pumps was back again today doing his thing. He'll be back again near the end to install the pumps.
There was still some frame work and more pink batts to do today. Most of that has been done.
So here are the photos....
Coming from the garage, cupboard straight ahead, the only one!
Door on left, little loo, door on right, our bedroom
Little loo
Moose, working hard!
Making our way up the hallway....
The 'Front door!' Entrance.
Up the steps to the family room
2nd bedroom door on the left
Looking back the other way
Bathroom door to the left of the pink wall, the 2nd bedroom behind that same wall
Bathroom, the alcove is/will be in the shower
Standing in the shower 😉
Spare bedroom
Back in the lounde area, TV wall
Our bedroom
Craft room, most of the ceiling is done
Phew! Quite a long post.
More tomorrow