Saturday, 12 April 2025

Many hands make light work

 ...they sure did today. Some of Michael's workmates came to help put up GIB board.

They've done a great job, still some to do, but they achieved so much.

The guy installing the heat pumps was back again today doing his thing. He'll be back again near the end to install the pumps.

There was still some frame work and more pink batts to do today. Most of that has been done.

So here are the photos....

Coming from the garage, cupboard straight ahead,  the only one!

Door on left, little loo, door on right, our bedroom


Little loo


Moose, working hard!

Making our way up the hallway....

The 'Front door!' Entrance.




Up the steps to the family room
2nd bedroom door on the left

Looking back the other way

Bathroom door to the left of the pink wall, the 2nd bedroom behind that same wall

Bathroom, the alcove is/will be in the shower 

Standing in the shower 😉

Spare bedroom


Back in the lounde area, TV wall

Our bedroom

Craft room, most of the ceiling is done






Phew! Quite a long post.

More tomorrow 

Sue xx